This property is a historic building in the city centre. There was a non-original kitchen and dining room at the rear that was let down by low ceiling heights, a dingy outlook, lack of light and awkward proportions. Above there was a series of small bathroom and cupboard spaces, dominated by a convoluted corridor.

The brief was simple – the amount of accommodation was about right, but it was poorly performing and let the building down in both function, and aesthetics.

Several options were considered on how to extend or alter the back of the house to improve the kitchen layout, access to the courtyard garden and sort out the chaotic bathroom area. The final resulting design suited the owners best, and maximised the garden space and windows. In actual fact the overall shape and room positions was not drastically changed, but the quality of each space was improved enormously. The upstairs was widened to match the ground floor projection, and allow a separate wc, small laundry cupboard and full sized feature bathroom upstairs. Critically, the upstairs was also built two steps higher to gain ceiling head-height downstairs.

Two visually poor flat roofs have been removed and now replaced with pitched roofs of natural slate with integrated flush solar panels. The upstairs window is a traditional timber sliding sash and modern large panel windows and doors compliment the open-plan kitchen diner with the courtyard space downstairs. This contrast helps define the overtly modern parts of the building and enhances the historical core.

  • Service: Planning, and Detail Design
  • Budget: Undisclosed
  • Scale: Rebuild of kitchen, dining and bathroom
Before Photos
Project Drawings

Careful engineering and design of the new arrangement kept demolition to a minimum – an important consideration given the only access to and from the building site was through the narrow hallway over the original Victorian tiles and into the dead-end narrow street. Skip and delivery positions had to be negotiated with neighbours and careful management of workers had to play a part in design decisions, right from the start.

 

The project also included a top-floor dormer extension, enlarging the existing rather small one to gain workable head height, all approved within the conservation area. Built into the new roofs, solar panels linked with a battery system provide a decent proportion of the house’s electricity needs. Large sliding doors and a fully glazed corner really open up onto the courtyard, and maximise both the inside and outside spaces – even when closed in the winter it very much becomes another room of the house.